The primary sources my work draws on, grouped by publisher, with the pieces that use each one. Links go to the publisher’s own page.

NESO registers and data

Transmission Entry Capacity (TEC) Register

NESO data portal. The register behind the weekly TEC tracker.

Used in: TEC tracker, Edition 2 · TEC tracker, Edition 3 · TEC tracker, Edition 4 · The seven projects the NAO singled out · TEC tracker, Edition 1 · Grid connection dates are sliding · The TEC Register doesn’t show connections reform yet · Seven projects, 4.2 GW, gone from the register · Connection dates and grid upgrades · TEC tracker, Edition 5 · Why does CMP470 make sense? · Why does CMP470 make sense? (post) · Fixing the rules before the result · GB Grid can’t buy its way up the queue · TEC tracker, Edition 6 · Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test · TEC tracker, Edition 7 · TEC tracker, Edition 8 · TEC tracker, Edition 9 · Response to Ofgem on Transforming Connections Data · TEC tracker, Edition 10 · TEC tracker, Edition 11

Embedded Register

NESO data portal. Embedded projects in Scotland only.

Used in: TEC tracker, Edition 4

Interconnector Register

NESO data portal. Checked whenever an interconnector leaves the TEC Register.

Used in: TEC tracker, Edition 4

Future Energy Scenarios documents, including the Ten Year Outlook 2026 workbooks

NESO. Source of the connected-capacity, demand and utilisation figures for data centres.

Used in: 72.8 GW requested, 4 GW connecting, 1.4 GW drawn · Great Britain’s data centre queue, in three numbers · Are smaller data centres actually faster to power? · Not all data centres are the same, Part 1: what they pay

Final TNUoS Tariffs for 2026/27 (PDF)

NESO, January 2026. Transmission charges, including the demand residual bands.

Used in: What a data centre actually buys from the grid · What sits inside the data centre price gap

Transmission Demand Residual guidance (PDF)

NESO. How sites are banded and charged the fixed residual.

Used in: What a data centre actually buys from the grid

Britain’s Energy Explained: 2025 Review

NESO, 14 January 2026. Gas supplied 26.8% of Britain’s electricity in 2025.

Used in: Fourteen UK data centres, one test

NESO outlines new timelines for Strategic Energy Plans

NESO, 5 December 2025. The final Strategic Spatial Energy Plan in Autumn 2027; the Centralised Strategic Network Plan and Regional Energy Strategic Plans by the end of 2028.

Used in: Departures: where the UK’s data centre trains actually stand

Winter Outlook 2026/27

NESO, 23 October 2026. A 5.9 GW margin this winter, 9.5% of peak demand.

Used in: Friday’s board said Oslo’s platform was filling

Distribution network operators: Embedded Capacity Registers

UK Power Networks

UKPN open data portal. Free account needed to view the data.

Used in: ECR tracker, Edition 1 · ECR tracker, Edition 2

National Grid Electricity Distribution

NGED Connected Data portal.

Used in: ECR tracker, Edition 1 · ECR tracker, Edition 2

SSEN Distribution

SSEN data portal.

Used in: ECR tracker, Edition 1 · Four gigawatts left a connection register · Are smaller data centres actually faster to power? · ECR tracker, Edition 2

SP Energy Networks

SPEN.

Used in: ECR tracker, Edition 1 · ECR tracker, Edition 2

Electricity North West (1 MW and above)

ENW open data portal. Schemes under 1 MW are in a separate dataset.

Used in: ECR tracker, Edition 1 · ECR tracker, Edition 2

Northern Powergrid (1 MW and above)

Northern Powergrid open data portal. Schemes under 1 MW are in a separate dataset.

Used in: ECR tracker, Edition 1 · ECR tracker, Edition 2

Data Triage Assessment: Data Centre Demand Profiles

UK Power Networks, 11 February 2025. Operational data centres on the UKPN network by voltage level.

Used in: Are smaller data centres actually faster to power?

Codes and code modifications

Connection and Use of System Code (CUSC)

NESO.

Used in: Five controls on the connections queue · Ofgem’s data centre milestones may bite at 1MW

CMP192: Enduring Generation User Commitment

NESO.

Used in: Five controls on the connections queue

CMP376: Queue Management process

NESO.

Used in: Five controls on the connections queue

CMP448: Progression Commitment Fee

NESO.

Used in: Five controls on the connections queue

Distribution Connection and Use of System Agreement (DCUSA)

DCUSA. Governs the Embedded Capacity Register template.

Used in: Four gigawatts left a connection register · Are smaller data centres actually faster to power?

National Terms of Connection

Energy Networks Association. Section 3, clause 12.11C: review of unused import capacity.

Used in: 72.8 GW requested, 4 GW connecting, 1.4 GW drawn · 73 GW queueing, and no count of the capacity sitting idle

Ofgem decisions and consultations

CMP470: Oversubscribed Technologies Commitment Fee

Ofgem, minded-to consultation, 17 September 2026.

Used in: Five controls on the connections queue · Why does CMP470 make sense? · Why does CMP470 make sense? (post) · The WEF’s new data centre playbook · Response to Ofgem on CMP470 · What is the grid worth to a data centre? · Who owns the battery queue?

Proposed data centre connection reforms (Curate)

Ofgem, 29 July 2026.

Used in: Ofgem’s data centre milestones may bite at 1MW · Six rulebooks set a data centre size line · Curate consultation response · Flexible Hybrid Grid Connection · The WEF’s new data centre playbook · Who holds the cards when the biggest AI buyers go small · Who holds the cards (post) · What is the grid worth to a data centre? · What does the wait add up to? · What does the wait add up to? (article) · Andy Burnham can make the UK the fastest time to power · Andy Burnham can make the UK the fastest time to power (post) · Three lines to power, and the main one is suspended · Three lines to power, and the main one is suspended (post) · 73 GW queueing, and no count of the capacity sitting idle · Friday’s board said Oslo’s platform was filling

Transforming connections data: consultation

Ofgem, 25 September 2026. Proposes a demand capacity register. Closes 6 November 2026.

Used in: A grid date is a probability · What does the wait add up to? (article) · What does the wait add up to? · Response to Ofgem on Transforming Connections Data

Demand connections update

Ofgem, November 2025. Transmission demand queue 17 GW to 97 GW, November 2024 to June 2025.

Used in: Are smaller data centres actually faster to power? · Departures: where the UK’s data centre trains actually stand

Connect update: demand connections reform (PDF)

Ofgem, 16 June 2026. Describes non-firm and phased connections, with a path to firm.

Used in: Flexible connections and the AIEC

Connections Reform

NESO. The Gate 1 and Gate 2 process.

Used in: Five controls on the connections queue · TEC tracker, Edition 4 · Three lines to power, and the main one is suspended

RIIO-3 Final Determinations

Ofgem, 4 December 2025.

Used in: What a data centre actually buys from the grid · GB Grid can’t buy its way up the queue

RIIO-ED2 Final Determinations

Ofgem, 30 November 2022.

Used in: What a data centre actually buys from the grid

Access and Forward-Looking Charges Significant Code Review: Decision

Ofgem, May 2022.

Used in: What a data centre actually buys from the grid

Targeted Charging Review: Decision and Impact Assessment

Ofgem, December 2019.

Used in: What a data centre actually buys from the grid

Decision on accelerating onshore electricity transmission investment (ASTI)

Ofgem, December 2022.

Used in: The seven projects the NAO singled out · Connection dates and grid upgrades · Mind the gap: the kit turns up, the grid doesn’t

Ofgem agreement on alternative Gate 2 to Whole Queue (G2tWQ) timetable

Ofgem, 2 October 2026. A second extension for Gate 2 Phase 1 offers, from 30 September to 31 October 2026.

Used in: Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended

Transforming the connections experience: consultation

Ofgem, 25 September 2026. Proposed requirements on transparency, customer protections and timely delivery of connections. Closes 6 November 2026.

Used in: Response to Ofgem on Transforming the Connections Experience

Feed-in Tariffs Annual Report: Scheme Year 15

Ofgem, December 2025. £1.73bn of scheme costs over 241 TWh of supply, April 2024 to March 2025.

Used in: Not all data centres are the same, Part 1: what they pay

High-capacity, low-utilisation standing charges: minded-to position (DCP 412)

Ofgem, 16 October 2026. E.ON’s proposal to move high-capacity, low-use sites into a cheaper residual charging band; Ofgem is minded to say no. Closes 11 December 2026.

Used in: 73 GW queueing, and no count of the capacity sitting idle

Enabling greater self-build of transmission connections

Ofgem consultation, 7 October 2026. Would let a customer build every sole-use asset between its site and the existing transmission system, beyond today’s 2 km limit.

Used in: Self-build fixes the last two kilometres. Who fixes the rest?

Extending competition in electricity transmission: criteria, pre-tender and conflict mitigation arrangements

Ofgem. The criteria for tendering new, separable onshore transmission projects.

Used in: Self-build fixes the last two kilometres. Who fixes the rest?

Eastern Green Link 1 delay event

Ofgem. The joint venture’s request for delay relief on EGL1: 480 days asked for, 57 granted.

Used in: Mind the gap: the kit turns up, the grid doesn’t

Planning, permitting and data centre schemes

Specified generator: when you need a permit

Environment Agency guidance, GOV.UK. Includes when a mobile generator is treated as static.

Used in: If the UK had its own Elon Musk, how fast could they build a data centre? · If the UK had its own Elon Musk (post)

The Environmental Permitting (England and Wales) Regulations 2016

SI 2016/1154. Medium combustion plant, specified generator and installation permits.

Used in: If the UK had its own Elon Musk, how fast could they build a data centre? · If the UK had its own Elon Musk (post)

Environment Agency corporate scorecards 2025 to 2026

Environment Agency, GOV.UK. Share of permit decisions made on time, by category.

Used in: If the UK had its own Elon Musk, how fast could they build a data centre?

Planning Act 2008, sections 14 and 15

When a generating station is a nationally significant infrastructure project (over 50 MW onshore in England).

Used in: If the UK had its own Elon Musk, how fast could they build a data centre? · Three lines to power, and the main one is suspended

Planning Inspectorate management information: nationally significant infrastructure projects, July 2026

Planning Inspectorate, GOV.UK. Average time for each stage of a development consent order.

Used in: If the UK had its own Elon Musk, how fast could they build a data centre? · Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended

Data centre campus, Wapseys Wood, Buckinghamshire: section 35 direction

MHCLG, 16 March 2026. SDC M40 Campus directed into the nationally significant infrastructure regime.

Used in: If the UK had its own Elon Musk, how fast could they build a data centre? · Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test · Three lines to power, and the main one is suspended

SDC M40 Campus: Stage Two community consultation

Developer’s consultation, 15 September to 27 October 2026. The gas energy centre and grid-only options.

Used in: Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test

Data centre campus, Ampthill Road, Bedford: section 35 direction

MHCLG, 15 June 2026. Quest Park, Stewartby: gas generation at each building until a grid connection arrives.

Used in: Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test · Three lines to power, and the main one is suspended

Thames Valley Park data centre: outline application 262274

Wokingham Borough Council planning portal (search for 262274). Validated 28 September 2026.

Used in: Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test

Elsham Tech Park: planning committee report, PA/2025/643

North Lincolnshire Council, Planning Committee, 11 March 2026. Standby diesel generators and gas engines.

Used in: Fourteen UK data centres, one test

Determining a planning application

Planning Practice Guidance, GOV.UK. Statutory determination periods of 13 weeks for a major application, or 16 where an environmental impact assessment applies.

Used in: Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended

England data center planning applications doubled in 2025, FOI requests reveal

DCD, 27 May 2026. Reports Hoare Lea’s analysis of 33 data centre applications: about 490 days on average to secure consent.

Used in: Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended

Data centres: Chief Planner letter and EIA Direction

Scottish Government, September 2026. Data centres above 50 MW are EIA development from 17 September 2026.

Used in: Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended · Departures, part 2: is any train in Europe leaving on time?

Data centres formally brought into the NSIP regime: what developers need to know

Forsters. Regulations made on 8 January 2026 let data centres opt into the NSIP regime through a section 35 direction.

Used in: Departures: where the UK’s data centre trains actually stand

SDC M40 Campus (EN0110030)

Planning Inspectorate project page. Pre-application; submission expected January 2027.

Used in: Departures: where the UK’s data centre trains actually stand

AI Growth Zones yet to accelerate planning activity, FOI data suggests

Data Centre Review, 20 August 2026. Search Acumen’s FOI analysis: one relevant planning permission in South Oxfordshire in 2025.

Used in: Departures: where the UK’s data centre trains actually stand

National Planning Policy Framework

MHCLG, 17 August 2026. Policies E1 and E2: data centres with their associated generating capacity and grid connections, and the co-location of large generators with large users of power.

Used in: Three lines to power, and the main one is suspended

Draft National Policy Statement for Data Centres

Laid before Parliament 28 October 2026. An indicative minimum of 100 MW of rated IT load for a section 35 direction, and a presumption of consent. Consultation closes 8 January 2027.

Used in: Three lines to power, and the main one is suspended

Motion S7M-01177

Scottish Parliament, 16 September 2026, agreed as amended by 80 votes to 26. No decisions on hyperscale applications until national planning guidance is complete.

Used in: Departures, part 2: is any train in Europe leaving on time? · Departures, part 2: is any train in Europe leaving on time? (post)

Government, Parliament and other published evidence

Clean Power 2030 Action Plan

DESNZ, December 2024.

Used in: Five controls on the connections queue

Upgrading the electricity transmission network (HC 589)

National Audit Office, 11 September 2026.

Used in: The seven projects the NAO singled out · GB Grid can’t buy its way up the queue

Written evidence DCU0081

NESO to the Environmental Audit Committee. Source of the 72.8 GW data centre request figure.

Used in: 72.8 GW requested, 4 GW connecting, 1.4 GW drawn · Great Britain’s data centre queue, in three numbers · The WEF’s new data centre playbook · Are smaller data centres actually faster to power? · What does the wait add up to? (article) · Departures: where the UK’s data centre trains actually stand

Written question HL5239

UK Parliament, answered 11 March 2025. DSIT’s estimate of data centre capacity by region.

Used in: Scotland’s data centre applications

Power In (12 Pillars of Change)

TwentyForty. Metered utilisation of data centres on UK Power Networks’ network.

Used in: 72.8 GW requested, 4 GW connecting, 1.4 GW drawn · Great Britain’s data centre queue, in three numbers · Not all data centres are the same, Part 1: what they pay

RO to Exchequer and ECO costs schemes: guidance for suppliers

DESNZ, GOV.UK, March 2026. 75% of domestic Renewables Obligation costs off domestic electricity bills from 1 April 2026.

Used in: Five conferences on energy

Factcheck: 10 flaws in the Conservative report on ‘cheap power’

Carbon Brief, 20 August 2026. On the Onward modelling.

Used in: Five conferences on energy

US Data Center Energy Procurement: The Good, The Bad, and The Ugly (PDF)

EnergyTag, September 2026, draft for comment. Rates 21 US data centre projects on how they buy their power.

Used in: Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test

Electricity in the U.S.

US Energy Information Administration. Natural gas about 41% of US utility-scale generation in 2025.

Used in: Fourteen UK data centres, one test

Downing Renewable Developments partners with Kao Data to build green data solar farm

Kao Data, 18 November 2025. Up to 40 MW of solar by private wire to the Harlow campus.

Used in: Fourteen UK data centres, one test · Fourteen UK data centre schemes passed the test · UK data centre map, Edition 2: live today

Spotlight: UK Data Centre Building Capacity, H1 2026

Savills Research, 2 July 2026. Inference build-out in modular 5 to 20 MW tranches.

Used in: Are smaller data centres actually faster to power?

Written evidence DCU0037

Water UK to the Environmental Audit Committee, Data Centres’ Water Use inquiry, April 2026. Data centres use about 6.6 million litres a day.

Used in: A year of data centre water, measured in hours of leakage

Water Efficient Data Centres

WRc, sponsored by MOSL through the Market Improvement Fund, February 2026. England data centre mains water use of about 1.88bn litres a year.

Used in: A year of data centre water, measured in hours of leakage

Water, data centres, floods and sewage

Foxglove, 28 July 2025, with The Times. UK data centre drinking water use estimate.

Used in: A year of data centre water, measured in hours of leakage

Water Company Performance Report 2024-25

Ofwat, October 2025. Leakage across England and Wales in 2024-25.

Used in: A year of data centre water, measured in hours of leakage

AI Energy Council minutes: Monday 13 April 2026

DSIT and DESNZ, published 19 June 2026. Around 125 GW of demand in the connections queue, and non-firm connections among the flexibility options explored.

Used in: Flexible connections and the AIEC

UK-first trial of AI grid technology successfully demonstrates the ability of data centres to adjust power needs

National Grid, with Nebius and Emerald AI. A five-day trial in December 2025 at a London data centre cut a GPU cluster’s demand by up to 40% across more than 200 simulated grid events.

Used in: Flexible connections and the AIEC

Jackdaw gas field gets green light

DESNZ, 21 October 2026. The government’s announcement of consent for the Jackdaw gas field.

Used in: Data centres, measured in Jackdaws

UK Greenlights $3B Jackdaw Gas Project

Rigzone, 21 October 2026. Wood Mackenzie projects Jackdaw production in 2027 at an average of 140 million cubic feet a day, about 6% of UKCS gas supply.

Used in: Data centres, measured in Jackdaws

Strategic plan for long-term energy infrastructure

DESNZ press release, 22 October 2024. The first iteration of the Strategic Spatial Energy Plan to be published in 2026.

Used in: Departures: where the UK’s data centre trains actually stand

Strategic Spatial Energy Plan: deadline extension

DESNZ, 23 October 2026. NESO’s deadline to submit the plan moved to 31 December 2027.

Used in: Departures: where the UK’s data centre trains actually stand

AI Growth Zones

DSIT, GOV.UK collection.

Used in: Departures: where the UK’s data centre trains actually stand

The Data Centre Covenant

HM Treasury policy paper, 28 October 2026. Priority connections for strategic data centres, a Local Benefit Plan and a design PUE of 1.3 or better.

Used in: Departures: where the UK’s data centre trains actually stand · The Data Centre Covenant: what the Budget offered data centres

New Large Load Connections Re-opener Submission (PDF)

Cadent, January 2024. Large connections within 12 months, depending on reinforcement; governor installations can take up to two years.

Used in: Departures: where the UK’s data centre trains actually stand · Three lines to power, and the main one is suspended · Three lines to power, and the main one is suspended (post)

NESO reveals results of UK’s grid connection reforms

DCD, 9 December 2025. Results of NESO’s reformed connections pipeline for large demand.

Used in: Departures: where the UK’s data centre trains actually stand · Departures, part 2: is any train in Europe leaving on time?

NESO allows extensions to Gate 2 offer signing deadlines

Osborne Clarke, 16 June 2026. Holders have 90 days to accept a Gate 2 offer, with extra time only in narrow cases.

Used in: Departures: where the UK’s data centre trains actually stand

Government approves drilling in Jackdaw gas field

Press Association, via The Irish News, 21 October 2026. Adura’s chief executive: enough gas to heat the equivalent of around 1.4 million UK homes at peak production.

Used in: Data centres, measured in Jackdaws

PM defends approval of drilling at Jackdaw gas field in bid to improve energy security

ITV News, 21 October 2026.

Used in: Data centres, measured in Jackdaws

Accelerating electricity network connections for strategic demand: government response

DESNZ, 28 October 2026. Puts Ofgem’s decision on its data centre queue reforms in the first quarter of 2027, and confirms a priority lane for sponsored projects.

Used in: Three lines to power, and the main one is suspended · Three lines to power, and the main one is suspended (post)

British Industrial Competitiveness Scheme: guidance for applicants

GOV.UK, 10 August 2026. Eligible manufacturers stop paying RO and FiT costs from April 2027 and the Capacity Market cost from October 2027. Data processing and hosting (SIC 6311) is not eligible.

Used in: Not all data centres are the same, Part 1: what they pay · Not all data centres are the same, Part 1: what they pay (post)

Renewables Obligation level calculations: 2026 to 2027

DESNZ, 29 September 2025. An obligation of 0.472 certificates per MWh supplied.

Used in: Not all data centres are the same, Part 1: what they pay

Data Centre Impact Study (PDF)

National Grid DSO, November 2025. Plans on data centres drawing 70% of their booked capacity.

Used in: Not all data centres are the same, Part 1: what they pay

Applications Guide 2025 (PDF)

National Gas. Indicative stages for a bespoke connection to the national transmission system: about 36 months from the offer clock starting, on my sum of the stages.

Used in: Three lines to power, and the main one is suspended · Three lines to power, and the main one is suspended (post)

European Data Centres Figures Q1 2026

CBRE. Colocation vacancy by market for the first quarter of 2026.

Used in: Departures, part 2: is any train in Europe leaving on time? · Departures, part 2: is any train in Europe leaving on time? (post)

Great British Grid to speed up connections and cut bills

DESNZ press release, 29 September 2026. Launched GB Grid alongside the self-build proposal.

Used in: Self-build fixes the last two kilometres. Who fixes the rest?

Great British Grid: What’s the point?

Electrical Review, 30 September 2026. Suggests GB Grid could target investment in reinforcement while developers self-build.

Used in: Self-build fixes the last two kilometres. Who fixes the rest?

UK renewables deployment supply chain readiness study: 2026 update

DESNZ, by Baringa, 2026. Developers report about 18 months for a 132 kV transformer and about 24 months for a 400 kV unit.

Used in: Mind the gap: the kit turns up, the grid doesn’t

Grimsby to Walpole: project timeline

National Grid. Programme for the Grimsby to Walpole reinforcement.

Used in: Mind the gap: the kit turns up, the grid doesn’t

Dumfries North 400 kV Substation: engineering justification paper (PDF)

SP Energy Networks, RIIO-T3 business plan. The new 400/132 kV substation at Dumfries North.

Used in: Mind the gap: the kit turns up, the grid doesn’t

GE Vernova third quarter 2026 results

GE Vernova press release, 28 October 2026, as filed with the US SEC. Gas power backlog and slot reservations.

Used in: Mind the gap: the kit turns up, the grid doesn’t

European grid operators and regulators

Data Centre Constrained Area Overview, May 2026 (PDF)

EirGrid. The greater Dublin region is considered fully constrained.

Used in: Departures, part 2: is any train in Europe leaving on time? · Departures, part 2: is any train in Europe leaving on time? (post)

Review of Large Energy Users Connection Policy

CRU, decision CRU2025236, 12 December 2025. Sites of 10 MVA or more must provide dispatchable generation or storage equal to their full import capacity, and match 80% of their annual demand with new Irish renewables.

Used in: Departures, part 2: is any train in Europe leaving on time?

Délibération 2025-120: procédure de raccordement fast track (PDF)

CRE, 7 May 2025. The State identifies large sites, 400 MW to over 1 GW, whose 400 kV connection isn’t limited by grid capacity, with a 2028 to 2029 target.

Used in: Departures, part 2: is any train in Europe leaving on time?

Les data centers en chiffres clés

RTE, updated 1 June 2026. Nearly 18 GW reserved for around 80 data centre projects; recently connected data centres draw on average about 20% of the power they asked for.

Used in: Departures, part 2: is any train in Europe leaving on time?

Halvårsrapport 2026 (PDF)

Statnett, half-year report 2026. Mature applications for consumption up by around 2,000 MW year on year; 600 MW of new consumption connected over twelve months.

Used in: Departures, part 2: is any train in Europe leaving on time?

Energinet indfører midlertidig pause i nye nettilslutninger

Energinet press release, 2 March 2026. A temporary pause in new grid connection agreements.

Used in: Departures, part 2: is any train in Europe leaving on time?

Midlertidige tiltak for fortsatt forsvarlig systemdrift

Statnett press release, 9 November 2026. New grid reservations for data centres paused until 1 August 2027 at the latest, while functional requirements for data centres are written.

Used in: Friday’s board said Oslo’s platform was filling

Government seeks controlled growth of data centres in Norway

Norwegian Government, 9 November 2026. The announcement of a licensing regime for data centres; the post cites it as reported by Capacity.

Used in: Friday’s board said Oslo’s platform was filling