Home
Contents
Profile
Services
Articles
White Papers
Posts
Trackers
DC Map
Sources
Glossary
Contact
Contents
Everything on the site, grouped by theme. Many pieces build on earlier ones. Open a theme or switch to the timeline, then select a piece to see what it connects to, or go straight to a piece from the lists below.
By theme
Timeline
Article
Post
Tracker edition
Consultation response
Builds on
Registers and trackers 11 November 2026Tracker edition NESO register tracker, edition 11: 3 to 10 November 2026 4 November 2026Tracker edition NESO register tracker, edition 10: 27 October to 3 November 2026 28 October 2026Tracker edition NESO register tracker, edition 9: 20 to 27 October 2026 27 October 2026Tracker edition Embedded Capacity Register tracker: Edition 2 21 October 2026Tracker edition NESO register tracker, edition 8: 13 to 20 October 2026 20 October 2026Post A grid date is a probability 14 October 2026Tracker edition The TEC Register’s total moved 1.4 GW this week, and no capacity moved at all 7 October 2026Tracker edition NESO register tracker, edition 6: 28 September to 5 October 2026 1 October 2026Post GB Grid can’t buy its way up the queue 30 September 2026Tracker edition NESO register tracker, edition 5: 21 to 28 September 2026 23 September 2026Tracker edition NESO TEC Register tracker: Edition 4 22 September 2026Tracker edition Embedded Capacity Register tracker: Edition 1 21 September 2026Article Four gigawatts left a connection register this year, and the register cannot say where it went. MDM-ART-2026-07 16 September 2026Tracker edition NESO TEC Register tracker: Edition 3 14 September 2026Post The seven projects the NAO singled out have 37 GW sitting behind them 9 September 2026Tracker edition NESO TEC Register tracker: Edition 2 7 September 2026Post Connection dates and grid upgrades don't line up the way the industry assumes 2 September 2026Tracker edition NESO TEC Register tracker: Edition 1 1 September 2026Post Seven projects, 4.2 GW, gone from the register in a week. I can't tell you why from the data. 28 August 2026Post The TEC Register doesn't show connections reform yet, and NESO has now put in writing why. 26 August 2026Post Grid connection dates are sliding, and I can now show it project by project.
Data centre demand 12 November 2026Post Mind the gap: the kit turns up, the grid doesn’t 10 November 2026Post Friday’s board said Oslo’s platform was filling. On Monday, Statnett lowered the barrier. 10 November 2026Post UK data centre map, Edition 2: live today 8 November 2026Post UK data centre map, Edition 2: live Tuesday 10 November 10 November 2026Map UK data centre map, Edition 2 6 November 2026Article Departures, part 2: is any train in Europe leaving on time? MDM-ART-2026-23 6 November 2026Post Departures, part 2: is any train in Europe leaving on time? 5 November 2026Post What have data centres ever done for us? 3 November 2026Article Not all data centres are the same, Part 1: what they pay MDM-ART-2026-22 3 November 2026Post Not all data centres are the same, Part 1: what they pay 2 November 2026Article Three lines to power, and the main one is suspended MDM-ART-2026-21 2 November 2026Post Three lines to power, and the main one is suspended 30 October 2026Article Departures: where the UK’s data centre trains actually stand MDM-ART-2026-20 30 October 2026Post Departures: where the UK’s data centre trains actually stand 29 October 2026Article If the UK had its own Elon Musk, what would the time be worth? (Part 2 of 2) MDM-ART-2026-19 29 October 2026Post If the UK had its own Elon Musk, what would the time be worth? 28 October 2026Post The Data Centre Covenant: what the Budget offered data centres, and what it asked in return 26 October 2026Post Flexible connections and the AIEC, why it matters 22 October 2026Post Data centres, measured in Jackdaws 21 October 2026Post Loughton without the farmland, or the wait 19 October 2026Article Andy Burnham can make the UK the fastest time to power. He just needs to want to do it MDM-ART-2026-17 19 October 2026Post Andy Burnham can make the UK the fastest time to power. He just needs to want to do it 19 October 2026Post Are smaller data centres actually faster to power in Great Britain? 15 October 2026Post A year of data centre water, measured in hours of leakage 13 October 2026Article Fourteen UK data centres, one test, and why the map is smaller than you’d expect MDM-ART-2026-15 13 October 2026Post Fourteen UK data centre schemes passed the test. One rated Green. 12 October 2026Article If the UK had its own Elon Musk, how fast could they build a data centre? (Part 1 of 2) MDM-ART-2026-14 12 October 2026Post If the UK had its own Elon Musk, how fast could they build a data centre? 18 September 2026Post Great Britain’s data centre queue, in three numbers 18 September 2026Article 72.8 GW requested, 4 GW connecting, 1.4 GW drawn: the workings behind the data centre queue MDM-ART-2026-06 17 September 2026Post What sits inside the data centre price gap 15 September 2026Post Scotland’s data centre applications total roughly 7,150MW. NESO has allocated between one and two gigawatts. 21 August 2026Post Flexible Hybrid Grid Connection: coming to a British data centre near you? 18 August 2026Post What is social licence and how does it affect my data centre project?
Updated with the rest of the site each Wednesday. Only pieces already published appear here.