Mark Moore


I publish independent research on the structure of the GB grid connection market: capacity, ownership and the mechanics of connections reform. Most of it is built from NESO’s and the network operators’ own published data, with the arithmetic set out in full so a reader can check it rather than take it on trust.

The weekly register tracker, posts and longer articles are all here. My background is on the Profile page.

NESO Register Tracker

NESO register tracker, Edition 5, TEC Register, 21 to 28 September 2026: 2,056 projects, 679.4 GW capacity, net −10 MW this edition.

TEC Register, Edition 5 · 21–28 September 2026. Refreshed each edition — see the full series under Trackers. The monthly Embedded Capacity Register tracker is on the same page.

Latest