I publish independent research on the structure of the GB grid connection market: capacity, ownership and the mechanics of connections reform. Most of it is built from NESO’s and the network operators’ own published data, with the arithmetic set out in full so a reader can check it rather than take it on trust.

The weekly register tracker, posts and longer articles are all here. My background is on the Profile page.

NESO Register Tracker

Register level, 20 Oct
690.8 GW
684.3 GW on 25 Aug
Net change since 25 Aug
+10.1 GW
+6.5 GW before the 3.6 GW register transfer
Projects carrying Gate 2
128
21.7 GW; up 46 projects and 8.9 GW
Left / joined
6 / 34
1.93 GW left; 12.08 GW joined

TEC Register, Editions 1 to 8 · 25 August to 20 October 2026. Refreshed each Wednesday edition. See the TEC Register summary and the latest edition, Edition 8. The monthly Embedded Capacity Register tracker is on the Trackers page.

Recent publications

Upcoming events